Last piece of the puzzle

Kokanee Fishing Forums

Help Support Kokanee Fishing Forums:

SuperD

Moderator
Joined
Jan 22, 2009
Messages
3,859
Location
Utah
Perseverance and patience and the final pieces of the puzzle arrived. The boat is officially fully rigged and ready for testing, even if that means waiting until Spring.
 

Attachments

  • 056D81E2-A6A9-4C2E-8EAE-BE9466207CE5.jpg
    056D81E2-A6A9-4C2E-8EAE-BE9466207CE5.jpg
    86.4 KB
  • 75A86678-5E1E-482C-8D23-7A83B6846218.jpg
    75A86678-5E1E-482C-8D23-7A83B6846218.jpg
    67.7 KB
I requested the dealer put them on when I bought the boat. I wish the spacing was a little farther apart but I would have had to custom order the boat without the rail to get that. That boat was going to be an additional $5,000 so I'll live with it.
 
Either way it looks good Dave, having these items you've been awaiting on at a snails pace is actually at the right time of year. Your Christmas is fulfilled early. 101ok101
 
Thanks Don, it has been a labor of love. And with all the extra time I have been even more anal than normal about all the details.
 

Latest posts

Back
Top